The second carbon black production line with an annual output of 30000 tons was completed and put into operation on September 9, 2014. 60000t / a carbon black production capacity
- Categories:Company news
- Author:
- Origin:
- Time of issue:2015-04-29 10:32
- Views:
(Summary description)The second carbon black production line with an annual output of 30000 tons was completed and put into operation on September 9, 2014. 60000t / a carbon black production capacity
The second carbon black production line with an annual output of 30000 tons was completed and put into operation on September 9, 2014. 60000t / a carbon black production capacity
(Summary description)The second carbon black production line with an annual output of 30000 tons was completed and put into operation on September 9, 2014. 60000t / a carbon black production capacity
- Categories:Company news
- Author:
- Origin:
- Time of issue:2015-04-29 10:32
- Views:
The second carbon black production line with an annual output of 30000 tons was completed and put into operation on September 9, 2014. 60000t / a carbon black production capacity
Scan the QR code to read on your phone
- Business Consulting
- After sales service
- Support hotline 0795-6435699
- Back to top
Sweep and follow us
Copyright © Fengcheng Heibao Carbon Black Co., Ltd. Jiangxi ICP1200607 Powered by www.300.cn